Friday, April 17, 2009
Floorboards
Well it's been a while since I said anything, and I think everyone wants to know what is going on in the set department. At least I hope so, why else would you be here? Well, a small sample has managed to leak out of the dungeon that I work in for you to see.
These are the floorboards that I think I have settled on for the film. This particular piece will be used for the teaser, so unless there is a problem when filming it or Rusty throws a fit this will be the look of them.
For the teaser I needed one big rectangle of wood, and since I don't have one I made two equal(ish) sized pieces. Luckily a power saw makes short work of that.
Now doesn't that look pretty?
I needed a whole bunch of equal length(ish) "boards", so it's power saw to the rescue again! Now I have a whole pile of them.
By now I've got my rhythm down and my floor plan all laid out.
After I have glued them all down and let it dry, I apply a healthy coat of stain to it. I really want to make sure I get into every crack and crevice.
All done! I can't wait to see how it turns out for the teaser. Enjoy!
Labels:
claymation,
Moving Day,
stop motion animation
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment